Pacific Palisades
Fire Rebuild
CAISSON,
REBAR CAGES
AFTER INSPECTION OF THE DRILLED CAISSON HOLES AND INSPECTION OF THE STEEL REINFORCING BAR CAGES, THE TEAM LOWERS THEM INTO THE HOLES WITH SIDE WALL SPACERS EVERY 8’
AFTER INSPECTION OF THE DRILLED CAISSON HOLES AND INSPECTION OF THE STEEL REINFORCING BAR CAGES, THE TEAM LOWERS THEM INTO THE HOLES WITH SIDE WALL SPACERS EVERY 8’